[edit] What are NEC3 contracts?
NEC3 is a family of contracts that facilitates the implementation of sound project management principles and practices as well as defining legal relationships.
It is suitable for procuring a diverse range of works, services and supply, from major framework projects through to minor works and purchasing supplies and goods. The implementation of NEC3 contracts has resulted in major benefits for projects both nationally and internationally in terms of time, cost savings and improved quality.
This article explains how NEC contracts can be applied to highway management, and how they have been successfully employed for the Highway Maintenance Efficiency Program (HMEP)
[edit] How does NEC work?
NEC produces a diverse range of definitive end-to-end project management contracts that empower users to deliver projects:
The suite of contracts is uniquely flexible and can be used for the procurement of works, services and goods across all sectors – including public and private, buildings and infrastructure, plant and equipment – as well as all stages of the project lifecycle, from planning, design and project management to construction, maintenance and facilities management.
Each contract is supported by associated guidance notes and flow charts, explaining exactly what procedures should be followed by whom and when.
[edit] The NEC structure
The principal NEC3 contracts, short contracts and sub-contracts can be broadly grouped into works, services and supply. The choice of NEC3 form depends on the project complexity and level of risk.
Works encompasses purchases such as the construction, refurbishment and decommissioning of buildings, structures, process plants and infrastructure – including everything from houses, schools, hospitals and leisure facilities to infrastructure for water, energy, transport, industry and waste.
Services include purchases of professional services such as engineering, architectural, project management and consultancy works. It also covers composite services such as facilities management, cleaning, catering, security, maintenance and data processing.
Supply includes the supply of high-value goods and associated services such as transformers, generators, rolling stock, cranes, gantries and complex plant. It also includes lower-risk items such as building materials and products, stationery, personal protective equipment (PPE) and parts. Consultation documents should be clear about the consultation process, what is being proposed, the scope to influence and the expected cost and benefits of the proposals.
For further information, visit the NEC website. https://www.neccontract.com/
[edit] NEC contracts for highway management
NEC3 is widely recognised as having major benefits for projects both nationally and internationally in terms of time, cost savings and improved quality. For example:
[edit] Highways England Managed Motorway Framework
Highways England awarded a national framework contract for up to £2 billion of managed motorways schemes in February 2010. Balfour Beatty, a BAM Nuttall/Morgan Est joint venture, Carillion and a Costain/Serco joint venture were appointed to deliver the managed motorway schemes, which involve introducing variable speed limits and hard-shoulder running on sections of the busiest motorways to improve traffic flow during busy periods. Each scheme is being delivered as a package order using an NEC3 Engineering and Construction Contract.
[edit] Highways Maintenance Efficiency Programme (HMEP)
In a bid to ensure the critical success of the Government’s £6bn pledge to improve local roads between 2015 and 2021, the NEC suite of contracts has been positioned at the heart of a major overhaul of Local Authority (LA) highway service procurement.
Amongst growing pressure to tighten purse strings and requirements to make up any road network maintenance shortfall through other funding, a newly-established £578m fund – earmarked for rewarding LAs that can demonstrate efficiencies – represents a critical opportunity for councils.
The NEC3 Term Service Contract (with amendments) has been selected as the works contract at the centre of the new £6m Highways Maintenance Efficiency Programme (HMEP) – a sector-led procurement suite and best-practice framework established to revamp, simplify and standardise the way English Local Highway Authorities procure highway services.
The HMEP matches these essential savings and efficiencies with an ever-growing need for highways maintenance. It has been designed by the highways sector, for the highways sector, to enable change and provide the tools and resources to help leaders and managers transform delivery of roads and services.
Further details about the HMEP can be found here.
This article originally appeared as NEC contracts: application to road development and management schemes, published by the Institution of Civil Engineers on 31 March 2016. It was written by Adam Kirkup.
You can find more articles by the Institution of Civil Engineers here.
--The Institution of Civil Engineers
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Construction contract.
- ICE Conditions of Contract.
- Infrastructure conditions of contract.
- Institution of Civil Engineers.
- NEC3.
- NEC contract change management systems.
- NEC early contractor involvement.
- Overview of the road development process.
- Road construction.
- Road improvement scheme consultation.
- The NEC and the Z clause.
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.